Project Details
Location: Taytay, Rizal, Philippines
Trench Depth: 2.40 meters to 3.70 meters
Trench Width: 1.00 meters
Project Period: 2016
Activities: Sewer pipe laying
Highlights:
- Safer and faster excavation time.
- Cheaper than sheet piling.
- Aside of KS 100 box, for the installation you need a 30 Tons excavator and one assistant.