Project Details
Location: Pasig City, Metro Manila, Philippines
Typical Floor to Slab Height: 2.80 meters to 3.50 meters.
Project Period: 2015-2017
Activities: Concrete Beam and Slab Shoring of 39-Storey Building
Highlights:
- Safe and Cost Efficient for High Ceilings.
- Extreme Productivity.
- Long project duration – over 2 years.