Project Details

Location: Santo Tomas, Batangas, Philippines

Floor to Bridge Height: 25 meters

Project Period: 2019

Activities: Construction of the First Philippine Industrial Park (FPIP) Iconic Bridge, the 55-meter-long bridge spanning over the San Juan River.

Highlights:

  • Load capacity of 35 tons per leg for bridge shoring up to 25 meters.
  • Extreme Productivity.
  • Less equipment needed.

COFFRAL solution/ product: Atlas Heavy Duty Shoring (a.k.a. Bigboy)  

Share on Social Media !
Loading...
Hello! Can we help you?