Project Details
Location: Santo Tomas, Batangas, Philippines
Floor to Bridge Height: 25 meters
Project Period: 2019
Activities: Construction of the First Philippine Industrial Park (FPIP) Iconic Bridge, the 55-meter-long bridge spanning over the San Juan River.
Highlights:
- Load capacity of 35 tons per leg for bridge shoring up to 25 meters.
- Extreme Productivity.
- Less equipment needed.