Project Details

Location: Pasig, Metro Manila

Overall Height to Access: up to 43 meters.

Activities: Cable installation and painting of the newly constructed Parklinks cable bridge. Bridge linking Quezon City and Pasig on the banks of the Marikina River in the eastern part of Metro Manila.

 Highlights:

  • Fast, flexible and mobile/movable.
  • Different angles and difficult areas to access within the same frame.
  • Short project duration, need to act fast.
  • Extreme productivity.
  • Access extreme and different heights of the bridge from top to edges,  fast and safely.
Share on Social Media !
Loading...
Hello! Can we help you?