Project Details
Location:Pasay City, NCR, Philippines
Trench Depth: 2.40 to 3.80 meters
Trench Width: 3.50 meters
Project Period: 2022
Activities: Excavation, pipe laying and backfilling.
Highlights:
- Safer and faster excavation time.
- Cheaper than sheet piling.
- Trench Box is preventing the soil to erode due to the soil’s high moisture.
- Aside from KS 100 box, for the installation you need a 25 Tons excavator and one assistant.