Project Details
Location: Asumulong Highway Brgy. San Roque, Antipolo City, Philippines
Typical Floor to Slab Height: 3.15meters.
Project Period: 2022
Activities: Concrete beam and slab shoring
Highlights:
- Safe and cost-efficient for high capacity.
- Extreme productivity.
- Fewer materials are needed to make the installation compared to conventional shoring.