Project Details
Location: Keppel Batangas Shipyard
Overall Height to Access: 20 meters.
Project Period: 2022
Activities: Giving access using manlifts to the sandblasting and repainting of the ship’s exterior and interior.
Highlights:
- Fast, flexible and mobile/movable.
- Different angles and difficult areas to access within the same frame.
- Short project duration, need to act fast.
- Extreme productivity.
- Working at height sast and safely.