Project Details
Location: Abra Bridge, Abra, Cordillera Administrative Region, Luzon, Philippines
Typical Floor to Slab Height: 7.50meters.
Project Period: 2022
Activities: Coping beam Shoring
Highlights:
- Safe and cost-efficient for high capacity.
- Extreme productivity.
- Applicable for high elevation.
- Fewer materials are needed to make the installation compared to conventional shoring.