Coffral Asia logo black

Bayer’s Event Footbridge & Viewing Deck

Bayer project industrial ringlock scaffold footbridge and viewing deck

Coffral Philippines Champion Project Bayer’s Event Footbridge & Viewing Deck Period Nov-Dec 2022 Location Concepcion, Tarlac Category Access / Working at Height High quality construction solutions Project Details A scaffolding system was used to create footbridge access over the rice field and a viewing deck above the cornfield. Access industrial tower scaffold. No damage left […]

Boiler Tower Maintenance

Powerplant boiler maintenance. access scaffolding utilizing industrial ringlock scaffold. all-round scaffolding.

Coffral Philippines Champion Project Boiler Tower Maintenance Period Nov-Dec 2022 Location Calumpit, Bulacan Category Access / Working at Height https://youtu.be/jpJ67Q2M8L0?si=Wrc5L4Bvlin6PQfh CUSTOMIZED High quality construction solutions Project Details Highly specialized Industrial Ringlock installation was used for boiler preventive maintenance and ultrasonic testing. Here’s the scope of this impressive project. Our Coffral scaffold solution was 7.05m (L) […]

LBC Warehouse Construction

boom lift LBC warehouse project

Coffral Philippines Champion Project LBC Warehouse Construction Period Aug-Oct 2022 Location Parañaque, Luzon Region Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the steel structure for the construction of a new LBC express warehouse. The overall height […]

Abra Bridge

Abra bridge staflex concrete slab shoring

Coffral Philippines Champion Project Abra Bridge Construction Period March 2021 – March 2022 Location Cordillera Administrative Region, Luzon Category Slab Shoring Previous Next High quality construction solutions Project Details Our Staflex slab shoring system was used for the coping beam shoring of the bridge. The typical floor-to-slab height was 7.50 meters. Safe and cost-efficient for […]

Airport Warehouse Construction

Airport Warehouse Construction. Aerial Platform. JLG

Coffral Philippines Champion Project Airport Warehouse Construction Period Aug 2022 – Mar 2023 Location Pasay City Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used for the cable installation and painting of the newly constructed Parklinks cable bridge. The bridge linking Quezon […]

Ship Blasting

Coffral ship blasting in Keppel shipyard Batangas Boom lift JLG 800AJ painting and blasting ship hull.

Coffral Philippines Champion Project Ship Blasting Period May-Aug 2022 Location Keppel Batangas Shipyard Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the sandblasting and repainting of the ship’s exterior and interior. The overall height to access was […]

Solar Panels Installation

Solar Philippines boom lift JLG 600AJ roof access to install solar panels.

Coffral Philippines Champion Project Solar Panels Installation Period Feb 2022 – Apr 2023 Location Asian Transmission Corp., Calamba, Laguna Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the installation of solar panels. The overall height to access was 15 meters. Fast, flexible, and mobile/movable. […]

Malolos Clark Railway (MCRP)

Malolos Clark Railway Project MCRP-CPN04 Acciona-EEI project showcasing Coffral industrial Ringlock scaffold. jacket scaffolding.

Coffral Philippines Champion Project Malolos Clark Railway (MCRP) Period Oct 2021 – Ongoing Location Clark – San Fernando, Pampanga Category Access / Working at Height Previous Next High quality construction solutions Project Details A scaffolding system is used during the construction of the substructure and superstructure of the viaduct. The Access will extend from 5 to 19m. Jacket […]

Tayabasan Weir 2

Tayabasan weir 2 project gondola suspended platforms

Coffral Philippines Champion Project Tayabasan Weir 2 Period Apr-Jun 2022 Location Brgy. Calawis, sitio Apia. Antipolo City Category Access / Working at Height https://youtu.be/u3q7pGS59p4?si=FJRyNyusQAoEtR95 CUSTOMIZED High quality construction solutions Project Details Gondolas with a platform length of 5 meters or 8 meters were used to do patching, grinding, and waterproofing on the dams.  Superior safety features. The highest […]

Puregold Antipolo Store Construction

Coffral staflex slab shoring and wooden beams c20 utilized for Puregold supermarket construction

Coffral Philippines Champion Project Puregold Antipolo Store Construction Period Feb 2022 – October 2022 Location Asumulong Highway Brgy. San Roque, Antipolo City Category Slab Shoring Previous Next High quality construction solutions Project Details Our Staflex slab shoring system was used for the concrete beam and slab shoring of the store. The typical floor-to-slab height was […]