LBC Warehouse

LBC Warehouse Painting. Gondola. Suspended Platforms. Industrial Ringlock.

Coffral Philippines Champion Project LBC warehouse Period May-2023 Location Parañaque Category Access / Working at Height Previous Next CUSTOMIZED High quality construction solutions Project Details Gondolas with a platform length of 8 meters were utilized for facade painting. The rooftop beams were directly attached to our Industrial Ringlock Scaffold in order to overcome the obstacle of […]

Warehouse Column Retrofitting in Mecauayan Bulacan

Removal of Wall Painting. Industrial Ringlock. Coffral Manpower.

Coffral Philippines Champion Project Warehouse Column Retrofitting in Mecauayan Bulacan Period May-2023 Location Mecauayan, Bulacan Category Access / Working at Height High quality construction solutions Project Details Retrofitting warehouse, using Atlas heavy-duty shoring towers for a vertical load of 25 tons per leg at 6 meters height. Load capacity of 25 tons per leg at 6 […]

Offshore Vessel Scaffold Installation Replacement of the cable guide roller

Offshore Vessel Scaffold Installation. Industrial Ringlock. Manpower

Coffral Philippines Champion Project Offshore vessel Scaffold Installation Replacement of the cable guide roller Period Feb – Mar 2023 Location Baseco, Manila Category Access / Working at Height https://youtu.be/gX8-6Flb9HI?si=-L4n-sqYcu8HvqDl EXTREME High quality construction solutions Project Details A scaffolding system was used to create access for the replacement of the cable guide roller. Access industrial scaffold Use of […]

Offshore Vessels Maintenance and Repairs

industrial Ringlock scaffolding. Offshore Vessel Repairs. Coffral-Manpower. Extreme hanging scaffolding offshore.

Coffral Philippines Champion Project Offshore Vessels Maintenance and Repairs Period Dec 2022 Location Offshore | Manila Bay Category Access / Working at Height https://youtu.be/WUZ_-9YjS28?si=8rMmxMo4onLMXU0k EXTREME High quality construction solutions Project Details A highly specialized hanging Industrial Ringlock scaffold installation was performed onto an offshore Hopper Barge Vessel to carry out maintenance and repairs in the Filipino […]

Bayer’s Event Footbridge & Viewing Deck

Bayer project industrial ringlock scaffold footbridge and viewing deck

Coffral Philippines Champion Project Bayer’s Event Footbridge & Viewing Deck Period Nov-Dec 2022 Location Concepcion, Tarlac Category Access / Working at Height High quality construction solutions Project Details A scaffolding system was used to create footbridge access over the rice field and a viewing deck above the cornfield. Access industrial tower scaffold No damage left […]

Boiler Tower Maintenance

Powerplant boiler maintenance. access scaffolding utilizing industrial ringlock scaffold. all-round scaffolding.

Coffral Philippines Champion Project Boiler Tower Maintenance Period Nov-Dec 2022 Location Calumpit, Bulacan Category Access / Working at Height https://youtu.be/jpJ67Q2M8L0?si=Wrc5L4Bvlin6PQfh CUSTOMIZED High quality construction solutions Project Details Highly specialized Industrial Ringlock installation was used for boiler preventive maintenance and ultrasonic testing. Here’s the scope of this impressive project. Our Coffral scaffold solution was 7.05m (L) […]

LBC Warehouse Construction

boom lift LBC warehouse project

Coffral Philippines Champion Project LBC Warehouse Construction Period Aug-Oct 2022 Location Parañaque, Luzon Region Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the steel structure for the construction of a new LBC express warehouse. The overall height […]

Airport Warehouse Construction

Airport Warehouse Construction. Aerial Platform. JLG

Coffral Philippines Champion Project Airport Warehouse Construction Period Aug 2022 – Mar 2023 Location Pasay City Category Access / Working at Height REMARKABLE High quality construction solutions Project Details An Aerial Working Platform (AWP) was used for the installation of steel beams for roofing of the  construction of New Manila International Airport. The overall height […]

Ship Blasting

Coffral ship blasting in Keppel shipyard Batangas Boom lift JLG 800AJ painting and blasting ship hull.

Coffral Philippines Champion Project Ship Blasting Period May-Aug 2022 Location Keppel Batangas Shipyard Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the sandblasting and repainting of the ship’s exterior and interior. The overall height to access was […]

Solar Panels Installation

Solar Philippines boom lift JLG 600AJ roof access to install solar panels.

Coffral Philippines Champion Project Solar Panels Installation Period Feb 2022 – Apr 2023 Location Asian Transmission Corp., Calamba, Laguna Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the installation of solar panels. The overall height to access was 15 meters. Fast, flexible, and mobile/movable […]