Project Details
A scaffolding system was used during the construction, masonry, and plastering of the Pagbilao Power Plant. The overall height to access was 19 meters.
- Safe and stable access system
- A great number of people can use the access scaffold at the same time
- Highest safety standards in the Philippines lift height
- Official calculation & drawings by Coffral engineer
Our Staflex slab shoring system was used for structural works, concrete beam, and slab shoring. The typical floor-to-slab height was 5 meters.
- Safe and cost-efficient slab shoring system for high capacity
- Extreme productivity
- Fewer materials are needed to make the installation compared to conventional shoring
COFFRAL Products In Use
our solutions
COFFRAL Products In Use
More projects
Looking For A Rental Equipment Provider For Your Next Construction Project?
Subscribe To Our COFFRAL Newsletter
Looking for a rental equipment provider for your next construction project?
With More Than 50 Years Of Construction Experience
Subscribe To Our COFFRAL Newsletter
CUSTOMIZED