As of 11 September 2015… Coffral has installed over 250,000m3 of scaffolding in Refineries, industrial production facilities and cement factories without accident. Coffral has supervised and engineered about 175,000m2 of ceiling poured in vertical and horizontal projects without accident.
Coffral provides the highest engineering designs and calculations on behalf of their dear customers. We aim at finding the best solution for our clients, using over 50 years of our expertise in the field.
Coffral stand for quality and we will stick to that. Coffral will always provide a quality product and high-end service to all Coffral’s customers.
“Coffral will always aim to reach the next level.”
Staflex is the original H-Frame system for the creation of ceilings, developed by the founder of Coffral. Staflex is a shoring system widely used over the globe and is perfect for the creation of sealing up to 12m high. It is by far the most economical, safest and efficient construction tool for flat or uneven (slab & beams) ceilings. Ideal for in-situ concrete pouring, precast or trans-slab.
Coffral telescopic shoring is a European Standard (EN 1065) prop, with high load bearing capacity. Easy to be install and strip. All shoring jacks are made of galvanized steel for long life and safe construction design. All Coffral Shoring jacks are available in two (2) types: Shoring Jack 10KN and 20KN. It is perfectly suitable for re-shoring of ceilings up to 5.50m high. Coffral huge rental stock is a combination of Hunnebeck, Peri and Doka shoring Jacks
Ringlock is the number “1” access system in the world. That can be expanded in all directions and can reach heights up 150m. The Ringlock access system can be adjusted in many ways. Ringlock is the quickest, most efficient and best scaffolding solution suited for your company’s “working at heights” requirement. Its unique rosette ring is the heart of Ringlock scaffolding system. This scaffolding system is the future for all off-shore and on-shore industrial activities.
The trench boxes or horizontal shoring system from ThyssenKrupp Bauservice subsidiary “E+S Verbau & Krings Verbau” are suitable for deep excavations up to 14 meters deep with a maximum width of about 20m and as long as needed. It performance in all type of soil type. The only thing you need in order to be able to install different trench-shoring system is a bulldozer of 20 or 50 ton and two workers. Perfect for sewer and pipe laying works. Even pipes bigger then 5m diameter can be installed with “E+S Verbau & Krings Verbau” solutions.
To expand certain portions of the 84-kilometer NLEX where there is traffic buildup in order to decongest the expressway, particularly in key toll exits, the Manila North Tollways Corp. is implementing the construction of lay bay lanes and U-turn slot in every 2km of the 6km stretch highway that connecting the Bulacan and Pampanga. COFFRAL will support the column and slab of the pier cap using the COFFRAL ATLAS HEAVY DUTY SHORING a.k.a. “BIG BOY” which can shore concrete slab up to a maximum thickness of 7.50m and reach beyond 20.00m.