Coffral Philippines Champion Project

Solar Panels Installation

Period

Feb 2022 – Apr 2023

Location

Asian Transmission Corp., Calamba, Laguna

Category

Access / Working at Height

High quality construction solutions

Project Details

An Aerial Work Platform (AWP) was used to give access to the installation of solar panels. The overall height to access was 15 meters.

  • Fast, flexible, and mobile/movable
  • Different angles and difficult areas to access within the same frame
  • Extreme productivity. Multiple areas can be reached without relocation/installation/dismantling
  • Working at height fast and safely
  • High safety requirements are easily met when using manlifts
  • Difficult-to-access areas are reachable when using an articulated boom lift
  • Although the facade has many obstructions, our AWP can adapt perfectly around them
  • Faster and more efficient solution
  • Our MEWP can lift 5 to 6 solar panels
  • Coffral facilitates and organizes the mandatory Third-Party certification at the start of the project

More Project Updates
on LinkedIn

Looking For A Rental Equipment Provider For Your Next Construction Project?

Subscribe To Our COFFRAL Newsletter

Looking for a rental equipment provider for your next construction project?

With More Than 50 Years Of Construction Experience

Subscribe To Our COFFRAL Newsletter