Coffral Asia logo black

LRTA Pipe Laying

Coffral trench boxes, trench shoring system utilized for LRTA pipe laying

Coffral Philippines Champion Project LRTA Pipe Laying Period Jan – May 2022 Location Pasay City, NCR Category Trench Shoring Previous Next High quality construction solutions Project Details Our KS100 trench shoring system was used for excavation, pipe laying, and backfilling. The trench depth was 2.40 to 3.80 meters and the trench width was 3.50 meters. […]

Southern Ocean Vessel Repair

Coffral industrial Ringlock scaffold utilized offshore for gantry vessel repair in Manila bay. offshore scaffolding.

Coffral Philippines Champion Project Southern Ocean Vessel Repair Period Feb 2022 Location Offshore | Manila Bay Category Access / Working at Height Previous Next EXTREME High quality construction solutions Project Details Offshore installation and dismantling of access tower for maintenance work at Southern Ocean’s McGregor Crane and NOV Crane. The overall height to Access was […]

Parklinks Bridge Construction

Parklinks bridge painting and welding done thanks to Coffral ultra boom lift JLG 1350SJP

Coffral Philippines Champion Project Parklinks Bridge Construction Period Jan – Mar 2022 Location Pasig, Metro Manila Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used for the cable installation and painting of the newly constructed Parklinks cable bridge. The bridge linking Quezon […]

Clark Int’l Airport New Terminal Building Cleaning

Clark International Airport terminal maintenance and annual cleaning done thanks to Coffral electric scissor lifts JLG 3246ES

Coffral Philippines Champion Project Clark Int’l Airport New Terminal Building – Cleaning Period Dec 2021 – Jan 2022 Location Clark International Airport, Pampanga Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to the ceiling of the Clark International Airport’s […]

Republic Cement Plant Silo Inspection

Republic Cement Powerplant silo inspection done with Coffral gondola

Coffral Philippines Champion Project Republic Cement Plant Silo Inspection Period Nov 2021 – Jan 2022 Location Norzagaray, Bulacan Category Access / Working at Height Previous Next High quality construction solutions Project Details Gondolas with a platform length of 3 meters were used to get samples onto the silo for future retrofitting work. Superior Safety features. The […]

Malolos-Clark Railway (MCRP)

Malolos Clark Railway Project MCRP utilized Coffral Scissor Lift JLG 2030ES

Coffral Philippines Champion Project Malolos-Clark Railway (MCRP) Period Nov – Dec 2021 Location Pampanga, Angeles Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to paint and weld the structural steel. The overall height to access was from 4 meters […]

Aircraft Maintenance, Repair and Overhaul (MRO)

Clark International Airport CRK aircarft maintenance repairs MRO utilizing Coffral boom lift JLG 600AJ

Coffral Philippines Champion Project Aircraft Maintenance, Repair and Overhaul (MRO) Period July 2021 – Jan 2023 Location Philippines International Airport Category Access / Working at Height Previous Next REMARKABLE High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to give access to check the vertical and horizontal stabilizers of the airplane/ […]

GMA Network Center Building Maintenance

Coffral Philippines Champion Project GMA Network Center Building Maintenance Period May 2021 – Sept 2022 Location GMA Network Center EDSA corner Timog Ave., Quezon City Category Access / Working at Height Previous Next CUSTOMIZED High quality construction solutions Project Details Working platforms and access scaffolding were used during the retrofitting of the GMA headquarters. The […]

Warehouse Construction

Warehouse Construction roofing. Roof panels installation. Boom lift JLG 600AJ.

Coffral Philippines Champion Project Warehouse Construction Period Apr-Jun 2021 Location Cabuyao, Laguna Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to install panel sheets on the new cold storage warehouse. The overall height to access was 15 meters. High safety requirements. Difficult […]

St. Luke’s Medical Center Maintenance

St. Luke's Medical Center facade maintenance. boom lift JLG 800AJ.

Coffral Philippines Champion Project St. Luke’s Medical Center Maintenance Period Feb-Mar 2021 Location St. Luke’s Medical Center, BGC, Metro Manila Category Access / Working at Height Previous Next High quality construction solutions Project Details An Aerial Work Platform (AWP) was used to repair the facade of St. Luke’s Hospital in BGC. The overall height to […]